DSC00608_350

Fixed!

KZSC can sometimes perform magic. We needed to do some extensive electrical work at our tower site today and, expecting the worst, we thought it would be heavy lifting until dark. Our crack engineering staff (Thank You Don Mussell!) made short work of the project, so we are back live on the air as of noon October 20th.

Thanks for your understanding; now you know why we have pledge drives.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply